BWTS Validation of Efficacy Test

We are among the first companies worldwide to be approved for the Ballast Water Treatment Systems (BWTS) Validation of Efficacy Tests. Our experience in retrofit of Ballast Water Treatment Systems (BWTS) gives us an intimate knowledge of these systems which has proven to be immensely helpful, making sure the system and preparations before the test is optimal. Reducing the time needed onboard the vessel to under 6 hours (time may vary if onsite adaptations are required).

We do:

D-2 Commissioning Test

Detailed analysis

Biological testing of organisms (>50Micrometers & 10<50 micrometres)

VGP Test

Enterococci Test

E.coli Bacteria test

Vibrio Cholera (O1 & O139)

We are certified by:

DNV, RINA, Lloyds, ABS, BV.

BWTS Test Info

Newly installed Ballast Water Treatment Systems (BWTS) is required to conduct a test of the BWTS to verify the system is working as intended (D-2 Commissioning test) from 01.06.2022

According to regulation E-1 included in the MEPC75 convention. BWM.2/Circ.70/Rev.1 & BWM.2/Circ.42/Rev.2